Version_2.5
| start over |

Pond Dam Construction (soil volume) Program
(1)
list dam's centerline stations:
by foot, separated by one comma
(2) those station's fill heights:
by feet point(.) tenths_of_feet, separated by one comma
(3) Slopes, Backside | Frontside:
(4) Topwidth:
(5) Image Format:
multiple rectangles, filled
multiple rectangles, unfilled
Polygon, filled
Polygon, unfilled
(6)
view with example numbers